BP-2000 Operating Instructions

Operating Instructions

Burst Perf Tester

Model BP-2000

Setup, calibration, testing and maintenance instructions for the ChemInstruments BP-2000 Burst Perf Tester.

Revision 1.2, January 22, 2026. ChemInstruments, 510 Commercial Drive, Fairfield, Ohio 45014. (513) 860-1598

ChemInstruments BP-2000 Burst Perf Tester

Product Description

Congratulations on the purchase of the ChemInstruments Burst Perf Tester, a versatile, user-friendly instrument for determining the burst strength of die cut label stock.

The unit has the following features:

  • Automated test sequence.
  • Selectable testing speed and length.
  • Tension relief and break mode.
  • Collected test data can be exported via USB port.
  • Selectable units of measure: Kilograms, Grams, Newtons, Pounds, and Ounces.
  • Compatible with EZ-Data System software.

Specifications

Electrical85-265 VAC, 50/60 Hz, 3 amps
Operating Temperature32–122 °F (0–50 °C)
Humidity0–55% relative humidity
Speed0.5-25 in/min (0.5 in/min increments)
1-64 cm/min (1 cm/min increments)
Data Test0.25-1.5 in (0.25 in increments)
0.5-3.5 cm (0.5 cm increments)
Dimensions (W x D x H)14 x 18 x 11 in (36 x 46 x 28 cm)
Weight29 lbs (13 kg)

Safety Warning

WARNING: This equipment can cause injury if not used properly. It is the operator's responsibility to read and follow all safety instructions.

ELECTRICAL WARNING: This is a dual-voltage machine. Ensure the unit is connected to the correct power supply (120 or 240 VAC). Incorrect power may cause equipment damage or electrical hazards.

Unpacking

Carefully unpack the Burst Perf Tester and inspect for shipping damage. If damage is found:

  • Take photographs
  • Retain all packaging
  • Notify the carrier immediately

Package Contents Checklist:

  • Test frame (with motor/drive and data acquisition system)
  • User manual (this document)
  • Power cord

Installation Instructions

  1. Position the Test Frame. Place the Burst Perf Tester on a stable, level workbench. Ensure sufficient clearance for the unit's physical dimensions (refer to the Specifications section).
  2. Recommended Operating Environment. Maintain laboratory conditions of 72 ± 2 °F (22 ± 1 °C) and 50 ± 5% relative humidity (RH) for optimal performance and repeatability.
  3. Connect Power. Insert the power cord into the receptacle on the rear panel of the unit, then plug the opposite end into a properly grounded AC outlet (see electrical specifications).
Rear panel of the BP-2000 showing the power receptacle and switch
The power receptacle and switch on the rear panel.

Key Components

Power Receptacle & SwitchFor inserting power cord
USB PortFor data export and easy setup
Load Cell AssemblyIncludes grip and calibration hook
GripSecures one end of the test strip to the load cell
Test Sample ClampSecures the other end of the test strip
Touch Screen DisplayMain interface for control and results
Front of the BP-2000 with the test sample clamp and the load cell assembly and grip labeled
Front: test sample clamp, load cell assembly and grip.
Back of the BP-2000 with the power receptacle and switch and the USB port labeled
Back: power receptacle and switch, USB port.

Touch Screen Format

Main Screen

Button/LabelFunction
Current LoadDisplays current load cell reading
Current SpeedDisplays current test speed
Sled MovementAccess sled movement options
SetupAccess setup options
GraphShows graph and results from last test
StatisticsDisplays data from last test
BP-2000 touch screen Main screen with Current Load, Current Speed, Sled Movement, Setup, Graph and Statistics
Main screen.

Sled Movement Screen

Button/LabelFunction
Current LoadDisplays current load cell reading
Current SpeedDisplays current test speed
Start TestBegin test sequence
ReturnReturn to previous test's data collection location
Jog LeftMove the cart left at 15 IPM
MainReturn to main screen
Jog RightMove the cart right at 15 IPM
BP-2000 Motor Movement screen with Start Test, Return, Jog Left, Main and Jog Right buttons
Sled movement screen.

Setup Screen

ButtonFunction
Calibrate Load CellLoad cell calibration
UnitsSet speed and force units
Test SetupSet test parameters: Speed, Tension Relief, Offset
Load Cell SizeSet currently installed load cell size
BreakSet break mode
Qualify OperationVerifies hardware function
AboutView software and hardware version
ExitReturn to main screen

NOTE: After 30 seconds of inactivity in any setup screen (except Qualify Operation), the screen will return to the Main Screen.

BP-2000 Setup screen with Calibrate Load Cell, Units, Test Setup, Load Cell Size, Break, Qualify Operation, About and Exit
Setup screen.

Test Setup Screen

ButtonFunction
SpeedSet test speed
Tension ReliefSet tension relief mode
OffsetSet test length
ExitReturn to setup screen
BP-2000 Test Setup screen with Speed, Tension Relief, Offset and Exit
Test setup screen.

Graph Screen

Displays the following data from the last test:

  • Force vs. distance graph
  • Minimum and maximum values

Statistics Screen

Shows test results, including:

  • Minimum and maximum
  • Variance and standard deviation
  • Work (area under the force-time curve)
  • Elongation
BP-2000 Statistics screen showing minimum, average, maximum, variance, standard deviation and work
Statistics, page 1.
BP-2000 Statistics screen showing elongation
Statistics, page 2.

Machine Setup

Power On the Instrument

WARNING: The instrument must operate within a temperature range of 32°F to 122°F (0°C to 50°C).

WARNING: Before applying power, ensure that the equipment is completely free of condensation, both inside and out. Moisture can cause internal damage or malfunction.

To power on the Burst Perf Tester, locate the master power switch on the back panel of the control cabinet, adjacent to the power line receptacle. Switch it to the ON position.

If the cart is not positioned at the home switch during startup, a warning message will appear. The system must establish the home position of the cart upon power-up to ensure proper operation.

BP-2000 Home System screen asking the operator to press Home to return the cart to the home position
Home system screen.

Load Cell Calibration

To ensure accurate and reliable test results, it is essential to calibrate the load cell before use. The Burst Perf Tester is equipped with an integrated calibration procedure, accessible through the touchscreen interface. Calibration should be performed:

  • During initial setup
  • After relocation or extended periods of inactivity
  • Whenever measurement accuracy is in question
  • As part of routine maintenance

IMPORTANT: Power on the Burst Perf Tester for at least 30 minutes prior to calibration to allow the system to stabilize.

NOTE: The calibration process uses grams as the default unit. Ensure calibration weights and inputs are in grams.

Calibration Procedure

Follow these steps to calibrate the load cell:

  1. Locate the wire attached to the load cell assembly.
  2. From the Main Screen, tap Setup.
  3. Select Calibrate Load Cell.
  4. Review the description of the two-point calibration process and tap OK to continue.
  5. When prompted for the low calibration value (zero load), ensure no weight is hanging on the calibration wire, then tap OK.
  6. When prompted for the high calibration value, hang a certified calibration weight of 1000 grams and verify that it is completely at rest. Enter the exact weight in grams, tap Enter, then tap OK to confirm and continue.
  7. You will be returned to the Main Screen, where the calibrated reading will display under Current Load.
  8. To verify calibration, hang a different known weight on the calibration wire and check if the displayed load matches the expected value.
  9. If the reading is inaccurate, repeat the calibration process.
BP-2000 with a calibration weight hanging from the calibration wire and pulley
A calibration weight hanging from the calibration wire.

Units Setup

To adjust the units of force and speed:

  1. From the Main Screen, tap Setup.
  2. Select Units.
  3. Choose your desired units.
  4. Tap OK to save your selections.

Speed Setup

To set the cart travel speed for your test:

  1. From the Main Screen, tap Setup.
  2. Select Test Setup.
  3. Select Speed.
  4. Enter the desired value, and press Enter.
  5. Tap OK to confirm.

Offset Setup

To set the length of travel for your test:

  1. From the Main Screen, tap Setup.
  2. Select Test Setup.
  3. Select Offset.
  4. Enter the desired value, and press Enter.
  5. Tap OK to confirm.

Tension Relief Setup

Tension Relief Mode ON

When a test is initiated with Tension Relief mode ON, the system first checks the force on the load cell. If the measured force is greater than 50 g, the cart will move 0.25 in to the right to relieve tension. After this movement, if the force is below 50 g, the cart will move left at 5 in/min until 50 g is measured. Once 50 g is reached, the test will begin. If the force remains greater than 50 g after the tension-relief movement, the test will be aborted and an error message will be displayed.

Tension Relief Mode OFF

When a test is initiated with Tension Relief mode OFF, the system does not attempt to relieve tension before loading. If the measured force is less than 50 g, the cart will move left at 5 in/min until 50 g is measured. Once 50 g is reached, the test will begin. If 50 g is not reached before the cart triggers the left travel limit, the test will be aborted.

To Set the Tension Relief Mode

  1. From the Main Screen, tap Setup.
  2. Select Test Setup.
  3. Select Tension Relief.
  4. Select ON or OFF.
  5. Tap OK to confirm.

Break Setup

When the Break setting is ON, the test will automatically terminate when the load cell reading drops to 0 g.

To Set the Break Mode

  1. From the Main Screen, tap Setup.
  2. Select Break.
  3. Select ON or OFF.
  4. Tap OK to confirm.

Load Cell Size Setup

Selecting the Load Cell Size configures the system's overload values for that load cell.

To Set the Load Cell Size

  1. From the Main Screen, tap Setup.
  2. Select Load Cell Size.
  3. Select correct size.
  4. Tap OK to confirm.

Grip Operation

To operate the grip:

  • Open the grip by turning the thumb screw counter-clockwise.
  • Insert the free end of the test specimen into the grip.
  • Close the grip by turning the thumb screw clockwise until secure.

IMPORTANT: The grip connects to the Load Cell Assembly via a mounting pin and yoke. Always remove the grip from the assembly to load test specimens safely.

Diagram of the grip open and closed, showing the thumb screw and washer
Grip open (left) and grip closed (right).

WARNING: Avoid rotating the yoke on the threaded mounting rod. If the yoke contacts the wall of the load cell housing, permanent damage may occur. Maintain a visible gap between the yoke and the housing to allow the load cell to operate correctly.

Qualify Operation

The Qualify Operation screen is designed to verify the proper functionality of key system components.

Diagnostic Tools

  • Current Load: Displays the real-time force measured by the load cell in selected units.
  • Current Speed: Displays the current speed setting.
  • Load Cell Reading: Shows raw analog-to-digital values from the load cell. Pulling on the calibration hook gives values > 32000; pushing on the calibration hook gives values < 32000.
  • Test Speed: Runs a 2-inch travel test to verify load cell assembly speed. The system measures and reports the time taken to travel the set distance.
  • Verify Load Cell: Records load cell output for 10 seconds. No movement occurs during this test. The system displays a force graph and statistical summary to confirm load cell accuracy using a calibration weight.
BP-2000 Qualify Operation screen with Load Cell Reading, Verify Load Cell, Test Speed and Exit
Qualify operation screen.

Theory of Operation

The Burst Perf Tester is designed to accurately measure the burst strength of die-cut label stock. The instrument complies with the requirements of TLMI Test L-1G for determining the die-cut burst ratio.

Test parameters including test speed, sampling distance, and Tension Relief mode are user-configurable through the Setup menu. The Jog and Return speeds are fixed at 15 in/min.

Test sampling begins once the load cell detects 50 g of force. Force data is collected by the data acquisition unit and stored in memory for calculation of maximum, minimum, and average values.

The load cell samples at a rate of 1000 samples per second. Eight consecutive samples are averaged and recorded as a single data point, resulting in a data point every 8 ms during the test.

Each test can store a maximum of 26,000 data points.

EZ Data Software System

EZ Data is a proprietary software application developed by ChemInstruments, designed to run on your computer and seamlessly interface with ChemInstruments testing equipment. This powerful tool enables users to:

  • Save test data files for archival or further analysis
  • Export raw test data directly to Microsoft Excel
  • Graph and crop data for clearer visual representation
  • Tabulate test data files for easy comparison
  • Overlay multiple test results to analyze performance trends

For detailed instructions on software features, setup, and operation, please consult the EZ Data User Manual.

The BP-2000 tester connects to your computer using a USB Type A-to-B cable, compliant with USB 2.0 (Revision 2.0) standards.

EZ Data Main Screen

The image below displays the main screen of the EZ Data software with a BP-2000 tester connected. This interface provides a comprehensive overview of the testing process, including:

  • Real-time load readings displayed as both a numeric value and a dynamic graph as data is received from the load cell
  • Current test setup parameters, clearly shown for reference

This intuitive layout ensures users can monitor, control, and modify tests with efficiency and precision.

EZ Data software main screen with a BP-2000 connected, showing current load, a force graph and the test setup
EZ Data main screen with a BP-2000 connected.

EZ Data Setup Screen

Test setup is streamlined within a single, centralized screen in EZ Data, providing a user-friendly interface for configuring all necessary test parameters. This unified setup screen allows users to efficiently define key settings such as test speed, offset, units, and modes, all without navigating through multiple menus. By consolidating setup functions into one location, EZ Data enhances workflow efficiency and reduces the potential for configuration errors, ensuring consistent and reliable test execution.

EZ Data BP-2000 Parameter Setup window with force units, speed units, speed, load cell size, tension relief, offset and break
BP-2000 parameter setup in EZ Data.

Maintenance

Troubleshooting

The troubleshooting chart outlines a range of potential issues that may arise during regular use or over time. Each listed problem includes possible causes and recommended corrective actions to help quickly identify and resolve the issue. Once the specific problem has been determined, refer to the corresponding maintenance procedure to perform the necessary corrective steps. These procedures are designed to restore optimal performance and minimize equipment downtime.

ProblemPossible CauseCorrective Action
Load Cell Assembly does not move during a testMotor is not allowing the assembly to moveReplace motor
Data measurement consistently low/highImproper calibrationCheck calibration
Bad calibrationRefer to load cell calibration
Calibration driftsBad or damaged load cellReplace load cell

Maintenance Procedures

As with all precision instruments, regular care and maintenance are essential to ensure accurate performance and extend the operational lifespan of the equipment. Consistent general cleaning and proper handling not only preserve the integrity of sensitive components but also help prevent malfunctions and minimize the risk of costly downtime. By adhering to recommended maintenance practices, users can maintain reliable test results and enjoy trouble-free operation over the long term.

Touchscreen Cleaning Guidelines

The touch panel is sensitive to chemicals and requires careful cleaning to maintain optimal functionality and appearance. Follow these specific cleaning instructions to ensure safe and effective care:

  • Use a soft, lint-free cloth for cleaning. The 3M Microfiber Lens Cleaning Cloth is highly recommended as it effectively cleans the touch panel without the need for liquid cleaners.
  • The cloth may be used dry or lightly dampened with a mild cleaner or ethanol. Ensure the cloth is only lightly damp, never wet.
  • Never apply cleaner directly to the touch panel surface. If any liquid accidentally contacts the panel, immediately blot it with an absorbent cloth to prevent seepage.
  • Use only neutral pH cleaners (neither acidic nor alkaline). Avoid any cleaners containing ammonia, phosphates, or ethylene glycol.
  • When applying cleaner, avoid contact with the edges of the film or glass and the flex cable tail to prevent damage.
  • Clean the surface gently, following the direction of any surface texture if present.
  • Do not use harsh chemicals such as paint thinner, acetone, toluene, xylene, kerosene, or strong alcohols like propyl or isopropyl alcohol in high concentrations.
  • Suitable cleaning products are commercially available and specifically formulated for delicate touch panels. Examples include Klear Screen™ and retail brands like Glass Plus® Glass and Surface Cleaner by Reckitt Benckiser.
  • Most commercial products contain 1–3% isopropyl alcohol by volume, which is generally safe for use on resistive touch panels.

IMPORTANT: Always check the product's ingredient list carefully. Many cleaners contain unacceptable substances such as ammonia, phosphates, or ethylene glycol, which can damage the touch panel's optical clarity and functionality.

Load Cell Removal

The load cell assembly can be removed to send back for recertification. First, unscrew the 2 screws shown in the photo below.

Top view of the BP-2000 load cell assembly showing the two mounting screws on either side of the grip
The two mounting screws sit on either side of the grip.

After the two screws are removed, gently pull the assembly back, exposing the connector. Disconnect the connector. Be careful not to tug on the wire.

BP-2000 load cell assembly pulled back to expose the wiring connector
The load cell connector, exposed once the assembly is pulled back.

Ready for a quote?

Tell us what you test and we will quote the burst perf tester, load cells, calibration, service or replacement parts you need.

Request a Quote